top of page

New Report Available in OneView

Pedigree is excited to announce that we have new reports available in OneView. The two new reports are the Jobs Overdue/Almost Due by Target Report and the Job Cost by Target Report. The Jobs Overdue/Almost Due by Target will allow users to more efficiently plan out maintenance schedules for assets and allows jobs users greater insight into overall job status. The Job Cost by Target Report will help users to easily track costs for each maintenance and/or job.

Steps to get to these reports:

  1. Click on the Reports tab account the top of OneView.

Reports_tip_1
  1. In the upper right corner of the report screen select New Custom Report.

Reports_tip_2
  1. The custom reports will display on the screen. In the Reports Type drop down select either the Jobs Cost by Target Report or Jobs Overdue/ Almost Due by Target Report.

Reports_tip_3

Jobs Overdue/Almost Due by Target Report: To pull this specific report follow the options below

reports_tip

Report Type: Jobs Overdue/ Almost Due by Target

Duration: The duration does not affect this report. It will always pull what is overdue or almost due right now or Users can set the duration for a future date and see what will be due during that specific time.

Assets: Click on the black wrench and choose the assets you would like included in the report

Reports_tip_5

Target: Asset selected for the job or maintenance

Job ID: Predetermined number by OneView or number entered by user

Job Name: Predetermined name by OneView or name entered by user

Assignee: Name of person assigned to this job or maintenance

Due Date: Date the user set for maintenance to be due or the due date OneView determined

Due Trigger: Displays the parameters  and value that the maintenance or jobs is due at

Current Status: Displays the current status of job or maintenance

Started: Will display date and time job or maintenance was started

 

Jobs Cost by Target Report:

To pull this specific report follow the options below:

Reports_tip_6

Report Type: Jobs Cost by Target Report

Duration:   In the drop down select the desired timeframe for this report

Assets: Click on the black wrench and choose the assets you would like included in the report

Reports_tip_7

Target: Asset selected for the job or maintenance

Assignee: Name of person assigned to this job or maintenance

Job ID: Pre- determined number by OneView or number users entered

Job Name: Pre- determined name by OneView or name user entered

Completed: Date and time it was completed

Part #: Part number entered when  job or maintenance was completed

Part: Name of the part

Qty: Total number of the parts used

Cost: Cost for each part used

Line Cost: Total cost for all parts for this line item

1 view
bottom of page